In a milestone achievement, Varuna delivered and installed a ready-to-move RCC Sewage Treatment Plant for a 500-laborer PG in the Dabaspet Industrial Area. This innovative plug-and-play system was delivered in just 2 days and fully installed and commissioned within 15 days, significantly cutting down traditional STP timelines.
The system's modular and movable design allows it to be relocated as per need, offering unmatched flexibility for industrial or large-scale residential setups. The treated water from the plant is now being reused efficiently for flushing activities, aligning perfectly with sustainable water management goals.
The installation supports an impressive environmental target: saving 72 lakh litres of water annually, which is equivalent to the annual water consumption of 29 families. This project stands as a model of how industrial and residential spaces can incorporate circular water use to reduce dependency on freshwater resources.
Project Name: RCC STP for 500 Laborers PG
Location: Dabaspet Industrial Area
Sector: STP (Sewage Treatment Plant)
Completed by: Varuna
System Type: RCC Plug-and-Play, Moveable System
Delivery Timeline: Delivered in 2 Days
Installation Time: Commissioned in a record 15 Days
Key Features:
Instant plug-and-play capability
Anytime movable for relocation flexibility
Reuse of treated water for flushing purposes
Sustainability Impact:
72 lakh litres of water saved annually
Equivalent to water usage of 29 families
Focus: Water conservation, rapid deployment, and future-ready infrastructure